OPERATION PROCESS
5.1
Prepare before start-up.
To make UPS normally and correctly run, please confirm the following
items. (Refer to figure 2)
1.
Verify power switch on back panel is on the “OFF” position.
2.
Verify the installation position again. (Figure 4 to 10)
3.
Rock power cable by hand and see if there is any looseness, retighten
them if looseness.
4.
Do not connect load.
5.
Inspect if input voltage meet the demand of UPS (220V±10%) with
ammeter.
5.2
Operation process for first start-up
After verify the above items are correct, please turn on UPS according
to the following ways:(Please refer to figure 1, figure 2, figure 3)
1.
Please switch power switch
“NON- FUSEBREAKER”
(NFB) on the back panel to the “ON”
position. Input indicator light and
bypass indicator light on the front
panel are lit on at the same time.
Aright figure.
Figure 18
Summary of Contents for PP10KL
Page 1: ...Online UPS PP1 15KL User Manual ...
Page 11: ... 8 ...
Page 14: ... 11 ...
Page 27: ... 24 Flow chart 1 of status handing ...
Page 28: ... 25 Flow chart 2 of status handing ...
Page 29: ... 26 Flow chart 3 of status handing Flow chart 3 of status handing ...