8)
Insert the control board power cable into the receptacle on the hard drive.
9)
Place the hard drive in the housing positioning it between the shock absorbers.
10)
Align the opening on the hard drive with the opening in the shock absorber and insert
the first screw. Tighten the first screw ensuring that proper alignment is maintained
while tightening.
Page 4 of 8
2
1/23/2005
file://E:\ONNTO-FOLDER\SC-M12CI+SC-M12O\35install.htm