2.6.3. LOTO - Machine maintenance and repair
This procedure should only be performed by an Authorized Employee.
It
describes how to shut down and lock out the Sure Sort when maintenance or
repair by an authorized service technician is required.
Power down the Sure Sort and install the lockout device as follows:
1.
Notify all personnel that you are about to begin the LOTO procedure.
2.
If possible, park the iBOTs.
3.
Power down the RTM computer. The RTM computer must be shutdown via
remote desktop from the Host computer before powering off the Host
computer.
4.
Safely shut down the host computer.
5.
After the host computer shuts down, manually power down the UPS.
6.
Place the “Caution” sign on the monitor (Figure 2-13).
Figure 2-13: Caution Sign
DANGER
Incoming power to the machine’s AC Distribution enclosure remains
energized when the main disconnect switch is OFF. To fully de-energize the
AC Distribution enclosure, an Authorized Employee shall complete all steps
in “LOTO - Machine maintenance and repair”, then disconnect machine from
customer’s AC power source as follows:
-
Plug-in machines, see
“Fully de-energizing AC power (plug-in
-
Summary of Contents for Sure Sort
Page 167: ...84 Sécurité Sure Sort Manuel de l opérateur OPEX Corporation Page laissée volontairement vide ...
Page 168: ...84 Safety Sure Sort Operator Manual OPEX Corporation Page intentionally blank ...
Page 316: ...158 Statistics Sure Sort Operator Manual OPEX Corporation Page intentionally blank ...
Page 318: ...Sure Sort Operator Manual G Glossary G 1 List of Acronyms 160 G 2 List of Terms 160 ...
Page 331: ...166 Sure Sort Manuel de l opérateur OPEX Corporation ...
Page 332: ...166 Sure Sort Operator Manual OPEX Corporation ...