5-4
System recovery from maintenance procedure
Turn ON switch S1 (for some UPS models only), S2 (for some UPS models only), S3 and S5, Turn
off S6 in sequence. Turn on S4 and then press “ON” button on the panel for a few seconds. A screen for
conforming setting appears. Press “ ENTER” button. The a message “Setting is successful” will appear
in a few seconds. The LCD panel will be illuminated after 50 seconds. Measure the voltage on terminal
B+ and B- to see if the value is exact 410VDC. Measure the output voltage and frequency of terminal R,
S, T to see if they are all correct. If the reading is correct, it means the system is initialized successfully.
Finally, install the protection plate on Switch S6. Please follow operating steps as shown in fig.5-3
。
Summary of Contents for DS-C33 100K
Page 1: ......
Page 7: ...Drawings 2 2C and 2 2D are the assembly diagrams of DS C33 series 45K 60K 80K Fig 2 2C ...
Page 8: ...Fig 2 2D ...
Page 9: ...Drawings 2 2E and 2 2F are the assembly diagrams of DS C33 series 22 5K 30K Fig 2 2E ...
Page 10: ...Fig 2 2F ...
Page 11: ...Drawings 2 2G and 2 2H are assembly diagrams of DS C33 series 10K 15K Fig 2 2G ...
Page 12: ...Fig 2 2H ...
Page 28: ...TIME SET DATE 200 TIME F 1 Date Time Set Y M D 200 H M S Succeed ...
Page 38: ...Fig 5 1 1 ...
Page 40: ...Fig 5 3 ...