3-4
3.2. Unpacking
Carefully take off all the packaging material of the UPS, then carefully locate the
UPS onto site which has selected with all the points in section 3.1 kept in mind.
The UPS had past the production testing and QC checking all the electrical and
mechanical characteristics in detail prior to shipment from the factory, therefore the
UPS should be in proper conditions upon receipt. Once receive the UPS, first check
visually the outlook and mechanical structure if any physical damage was made
during transportation.
Then check if all the accessories/options (match with your purchase order) have
been attached.
- DOOR KEY
- THIS INSTRUCTION MANUAL
- BATTERY FUSE (FOR BATTERY CABINET ONLY)
- SPARE SCREWS FOR COVER PLATE
- SPARE SCREWS FOR CONNECTION TERMINALS etc.
Lastly, check if the specification of the UPS identical to the specification you order.
The key items in the specification you must check are:
- RATED POWER OF THE UPS,
- INPUT VOLTAGE & FREQUENCY
- OUTPUT VOLTAGE & FREQUENCY
- NO. OF OUTPUT PHASES (1
Φ
OR 3
Φ
)
- BATTERY VOLTAGE OR CELL NO.
Check also the necessary documentation that is attached:
- GUARANTEE CARD
- AGENT/SERVICE CENTER INFORMATION
Summary of Contents for DS-D33
Page 1: ...OPTI UPS User s Guide Durable Series Models DS D33 www opti ups com ...
Page 16: ...1 12 1 7 Dimension Drawings 20KVA 60KVA OUTLINE DRAWING ...
Page 17: ...1 13 20KVA 60KVA INTERIOR DRAWING ...
Page 18: ...1 14 80KVA 160KVA OUTLINE DRAWING ...
Page 19: ...1 15 80KVA 160KVA INTERIOR DRAWING ...
Page 20: ...1 16 200KVA 320KVA OUTLINE DRAWING ...
Page 21: ...1 17 200KVA 320KVA INTERIOR DRAWING ...
Page 22: ...1 18 INTER PCB DIAGRAM ...