7
Assembly instructions
A). Insert the Foam Roll Tube(#6) into the hole on the top of the Incline Adjust Tube(#3) with half way,
attach two Foam Rolls (#4) from each side of the Foam Roll Tube(#6).
Attach two Foam Rolls (#4)
from each side of the Lower Protection Holder Tube(#5).
B) When finish workout, pull out the Lock Pin(#8), then fold up the Front T shape Stabilizer(#7) and
locked with Lock Pin(#8), the unit can be folded for storage to save space.
Step 3
Summary of Contents for SIT UP BENCH
Page 16: ...15 Exploded Parts Diagram...