7
Chapter 5
Installation and Maintenance
5.1 Installation
OPR300-05S and OPR300-05R may be installed in a fixed, semi-fixed and mobile environments
that meet the environmental characteristics specified in Chapter 2. These models are designed to
be mounted in a standard 19” equipment rack utilizing the mounting holes provided on the front
of each unit.
It is recommended that at least 1 rack unit (1U = 1.75”) gap be provided above
or below the OPR power supply unit for proper air flow.
Once these power supplies are mounted in the rack, they should be connected to the system (that
only requires 5VDC power) with the DC output connector located at the rear of the OPR unit.
¾
Next, ensure that the front panel power switch(es) are in "OFF" position.
¾
Connect the AC power cord to the unit by plugging the free end of the power cord into a
standard three prong AC outlet.
¾
Ensure that the AC power plug(s) located at the rear end of the power supply are
connected to a clean and well-grounded Universal AC source.
OPR300-05S Setup
Once all the wires are connected properly as described in the above installation paragraph:
(1) Turn "ON" the front panel switch.
(2) The "Power" LEDs, should light up.
Now the system is ready to operate to its required purpose.
OPR300-05R Setup
Once all the wires are connected properly as described in the above installation paragraph:
(1) Turn "ON" the front panel switch for Power supply 1
The "Power 1" green LED, and "PS 2 Alarm" red LED should light up. Indicating Power
supply 1 is "ON" and Power supply 2 is "OFF"
(2) Turn "ON" the front panel switch for Power supply 2
This should clear the "PS 2 Alarm" red LED and cause the "Power 2" green LED to
illuminate.
Now the system is ready to operate to its required purpose.
WARNING: Observe polarity when making connection to the rear of model
OPR300-05S / OPR300-05R