Version 1.0.1 - 2020-07-23
20
Translation of original instruction
B20 | B25 | B32
EN
B20-
B25-
B32_
GB.
fm
3.2
Scope of delivery
Check the drilling machine immediately after delivery for transport damage, missing parts and
loose locking bolts.
Compare the scope of delivery with the delivery note. Drilling machines in the standard pack-
age will be delivered as indicated below.
The standard delivery are:
3.3
Storage
ATTENTION!
Incorrect and improper storage might result in damage or destruction of electrical and
mechanical machine components.
Store packed and unpacked parts only under the intended environmental conditions.
Follow the instructions and information on the transport box.
Consult Optimum Maschinen Germany GmbH if the machine and accessories are stored for
more than three months or are stored under different environmental conditions than those spec-
ified here .
3.4
Installation and assembly
3.4.1
Installation site requirements
Organize the working area around the drilling machine according to the local safety regulations.
WARNING!
The drilling machine must be connected to the substructure.
INFORMATION
In order to attain good functionality as well as a long service life of the machine, the place of
installation should fulfil certain criteria.
Please observe the following points:
B20
B25 / B32
•
Drill head
•
Drill head
•
Drilling table
•
Drilling table support
•
Handle
•
Drilling table
•
Drilling table support
•
Handle
•
Stand
•
Stand
•
Column component
•
Toothed rod
•
Guide ring
•
Column component
•
Toothed rod
•
Guide ring
•
Drill chuck
•
Taper mandrel MT2
•
Drill drift
•
Drill chuck
•
Taper mandrel MT3 (B25)
•
Taper mandrel MT4 (B32)
•
Drill drift
•
3 x handle bar for spindle sleeve lever
•
3 x handle bar for spindle
sleeve lever
•
Assembly set
•
Assembly set
•
Operating Manual
•
Operating Manual
•
for 400 V: CEE - 16 A, with phase
inverter
•
CEE - 16 A, with phase inverter