User Manual – ePX 200
OptiPro Systems, LLC.
Page 58 of 60
Last Modified: 7/30/2014
10.1.8
Finding the Z-axis Chuck-to-Chuck Distance
1.
Jog Z down so that the upper and lower hydraulic chucks are close to each other as shown.
Figure 10-10: Finding the Chuck-to-Chuck Distance
2.
Using a gauge block from the tram kit, follow the directions on the tram screen and press
[SET] when finished.
Figure 10-11: Tram Sequence Screen 5, Upper and Lower Spindles Pinch Test
3.
When all tram screens are finished, press [SAVE] in the lower right corner. Your machine is
now ready to run.