3.3 Electrical Installation
The delivered glass system is already
pre-wired and is ready for operation
without
any
additional
electrical
installation.
To integrate the input signal from the
furnace with the glass inspection
system, you must open the control
cabinet. On the left side is a terminal
block, which is connected to different
colors of wires. These are labeled as
follows (
).
Figure 11:
Control cabinet open