Opus commissioning checklist
General information
Stove purchased from
Telephone number
Stove installed by
Telephone number
CPS registration with (e.g. HETAS)
CPS registration number
Installation date
Stove model
Physical checks
Installation is in accordance with the design, including material specification, flue length and
diameter
The installation instructions have been followed
There is no damage to any components
Joints between the appliance and chimney and within the chimney system are secure and in good
condition
The separation of components from combustible materials conforms to this code of practice
The appliance and chimney can be fully cleaned, once the installation is complete
Components for weatherproofing are installed correctly
Smoke spillage test has been carried out
CO Alarm fitted and tested
Handover
At handover all user instructions should be given to the user and an explanation of the appliance operation
and safety issues should be given. Additionally an explanation of the correct removal, relocation, and any
sealing of the removable/hinged section of the chimney should be given and all safety issues explained.
Commissioning engineer’s
signature*
*By signing this you confirm that all commissioning checks above have passed, and that operation and
maintenance of the appliance have been explained to the customer in full in line with this user manual.