Data Center
Environment
Considerations
Yes
No
N/A
Comment
If the room
cooling is from a
raised floor, then:
•
Are the
perforated
floor tiles
each rated at
400 CFM or
greater?
•
Can
additional
perforated
floor tiles be
obtained if
required for
additional
cooling?
Does the data
center air
conditioning
provide sufficient
front-to-back
airflow?
Is airflow
adequate to
prevent hot
spots?
Can the data
center
continuously
satisfy the
environmental
requirements?
Related Topics:
•
Temperature and Humidity Requirements
(page 1-44)
•
Ventilation and Cooling Requirements
(page 1-45)
Always provide adequate space in front and behind the rack to allow for proper
ventilation.
•
General Environmental Requirements
(page 1-1)
A.4 Access Route Checklist
Use this checklist to ensure that the access route requirements are addressed.
Appendix A
Access Route Checklist
A-6