Access Route
Considerations
Yes
No
N/A
Comment
Can the access
route support the
weight of the
unpacked rack?
Is the access
route onto the
raised floor rated
for dynamic
loading of the
rack?
Related Topics:
•
Table: Access Route Requirements.
(page 1-33)
•
Table: Rack Weights for Oracle Exadata Database Machine
•
Table: Rack Weights for Oracle Exadata Storage Expansion Rack
•
A.5 Facility Power Checklist
Use this checklist to ensure that the facility power requirements have been addressed.
Facility Power
Considerations
Yes
No
N/A
Comment
Have the
operating voltage
and electric
current
requirements
listed in
"
(page 1-34)"
been reviewed?
Will single-phase
(low-voltage or
high-voltage) or
3-phase (low-
voltage or high-
voltage) power
be used?
Are enough
power outlets
provided within 2
meters for each
rack?
Appendix A
Facility Power Checklist
A-9