PDU Reracking
Considerations
Yes
No
N/A
Comment
Does the target
rack support
installation of
standard Oracle
PDUs?
If not, then
complete this
checklist.
Can the
customer provide
an equivalent
pair of PDUs?
Can the
customer provide
two PDUs with
capacity of 10
kVA per PDU?
Can the
customer provide
at least 17 x 10A
C13 plugs per
PDU?
Can the
customer provide
a single PDU and
its circuits to
support the
Oracle Exadata
Rack power
requirements in
case one PDU
fails?
Can the
customer ensure
power loads are
evenly distributed
across all circuits
of a single PDU?
Can the
customer provide
appropriate
power drops for
the PDUs?
A.10.1 Recycling the Racks
Use this checklist when recycling the rack.
Appendix A
Reracking Checklists
A-22