C
HAPTER
6
Complete the Installation
Power On the System
As part of your site planning, you set up a separate circuit and power outlet for
each PDU. These outlets should be located within reach of the 15 ft (4.57 m)
PDU power input cables.
1 Ensure the PDU circuit breakers are off.
2 Connect the PDUs to a facility power source. If the facility's main circuit
breakers are off, turn them on to supply power to the PDUs.
3 At the front of the system, use a #2 flathead or Phillips head screwdriver to
secure the Slammer batteries in place with the two attached screws.
Figure 54 Secure Slammer batteries
Note: This image is for illustration purposes only. Your hardware
component might look different.
Chapter 6 Complete the Installation
Power On the System
125