Power On the Server (Oracle ILOM)
192
SPARC T5-4 Server Service Manual • July 2016
Power On the Server (Oracle ILOM)
Note -
The boot process depends on the most recent power state of the server and on Oracle
ILOM policy settings. You must determine if the server is running before you issue the
start /System
command.
1.
Check the server power state. Type:
->
show /System power_state
/System
Properties:
power_state = Off
2.
If the server is powered off, power on the server. Type:
->
start /System
Starting /System
3.
(
Optional
.) To view server boot output, start a host console stream. Type:
->
start /HOST/console
4.
If you are adding a second processor module, return to
.
Related Information
■
Summary of Contents for SPARC T5-4
Page 1: ...Part No E29663 11 July 2016 SPARC T5 4 Server Service Manual ...
Page 2: ......
Page 10: ...10 SPARC T5 4 Server Service Manual July 2016 ...
Page 12: ...12 SPARC T5 4 Server Service Manual July 2016 ...
Page 22: ...22 SPARC T5 4 Server Service Manual July 2016 ...
Page 44: ...44 SPARC T5 4 Server Service Manual July 2016 ...
Page 56: ...56 SPARC T5 4 Server Service Manual July 2016 ...
Page 86: ...86 SPARC T5 4 Server Service Manual July 2016 ...
Page 96: ...96 SPARC T5 4 Server Service Manual July 2016 ...
Page 106: ...106 SPARC T5 4 Server Service Manual July 2016 ...
Page 130: ...130 SPARC T5 4 Server Service Manual July 2016 ...
Page 144: ...144 SPARC T5 4 Server Service Manual July 2016 ...
Page 172: ...172 SPARC T5 4 Server Service Manual July 2016 ...
Page 182: ...182 SPARC T5 4 Server Service Manual July 2016 ...
Page 190: ...190 SPARC T5 4 Server Service Manual July 2016 ...
Page 198: ...198 SPARC T5 4 Server Service Manual July 2016 ...
Page 204: ...204 SPARC T5 4 Server Service Manual July 2016 ...