34
Sun Datacenter InfiniBand Switch 648 Installation Guide • May 2010
b. Repeat
Step a
so that the middle and bottom screws are installed.
c. Using a No. 2 Phillips screwdriver, securely tighten all three screws.
5. Set the assembled cable tree at the left front corner of the rack.