Installing the Switch
75
a. Grasp the handles at each end of the line card filler and lift the filler to the
vacant slot.
b. Slide the filler into the chassis until it stops.
c. While pressing the filler in with one hand, rotate the retainer bolts clockwise
by hand so that they engage.
When you feel resistance in the retainer bolts, stop.
d. Repeat
through
for all remaining vacant slots.
16. Power on the CMCs.
See
“Powering On the CMCs” on page 75
.
Related Information
■
Switch Service
, servicing line cards
■
“Line Card Distribution” on page 17
■
“Remove the Midplane Stiffener” on page 70
■
“Suggested Tools for Installation” on page 19
Powering On the CMCs
After installing the components, enable powering up of the switch by performing
these tasks in the following order:
Step
Description
Links
1.
Attach the management cables.
“Attach the Management Cables” on
page 76
2.
Attach the power cords.
“Attach the Power Cords” on page 78
3.
Check the power supply status LEDs.
“Check the Power Supply Status LEDs” on
page 80
4.
Check the CMC status LEDs.
“Check the CMC Status LEDs” on page 80
5.
Access the CMC.
“Accessing the CMC” on page 81
6.
Verify the CMC status.
“Verify the CMC Status” on page 86
7.
Identify the CMC addresses.
“Identify the CMC Addresses” on page 87
8.
Display the CMC FRU ID
information.