20
Sun Datacenter InfiniBand Switch 648 Installation Guide • May 2010
Related Information
■
“Unpacking the Chassis” on page 25
■
“Preparing the Chassis” on page 29
■
“Inspecting the Components” on page 45
■
“Installing the Components” on page 63
Antistatic Precautions for Installation
When installing the switch components, take care to follow antistatic precautions:
■
Use an antistatic mat as a work surface.
■
Wear an antistatic wrist strap that is attached to either the mat or a metal portion
of the switch chassis
Installation Responsibilities
The personnel who install the switch must be fully capable of the following tasks:
■
Rackmount a heavy object
■
Perform line voltage verification
■
Connect delicate cables in tight spaces
■
Configure network hosts and serial terminals
■
Perform software tasks of an administrative nature
■
Interpret screen output as it pertains to InfiniBand fabrics
Installation Sequence
The process of installing the switch has a specific sequence of tasks that must be
performed in order. The following table describes the switch installation task
sequence and provides links to those procedures.
Step
Link
1.
“Install the HPC Software Suite” on page 23
2.
“Remove the Shipping Carton Contents” on page 25
3.
“Unsecure the Chassis From the Pallet” on page 28
4.