Sun Datacenter InfiniBand Switch 648 Installation Guide • May 2010
Note –
You must perform these inspection tasks on all line cards to be installed.
Related Information
■
Switch Service
, inspecting line cards
■
“Inspecting the Midplane for Installation” on page 45
■
“Inspecting the Fabric Cards for Installation” on page 51
■
“Inspecting the InfiniBand Cables for Installation” on page 61
▼
Identify the Line Cards for Installation
1. Identify the prerequisite and subsequent tasks you must perform in
conjunction with this procedure, to install the switch.
See the table in
“Installation Sequence” on page 20
.
2. Use the following illustration to identify the various features of a line card.
Step
Description
Links
1.
Identify the line card.
“Identify the Line Cards for Installation” on
page 56
2.
Inspect the line card chassis.
“Inspect the Line Card Chassis for
Installation” on page 58
3.
Inspect the line card retainer bolts.
“Inspect the Line Card Retainer Bolts for
Installation” on page 58
4.
Inspect the line card XBOW
connectors.
“Inspect the Line Card XBOW Connectors
for Installation” on page 59
5.
Inspect the line card CXP connectors.
“Inspect the Line Card CXP Connectors for
Installation” on page 60