Installing the Switch
87
4. Verify that all installed components are recognized as installed:
If an installed component is not recognized, investigate why.
5. Consider your next step:
■
(Optional) Display and record the CMC FRU ID information.
See
“Identify the CMC Addresses” on page 87
.
■
Verify the power supply status.
See
“Verify the Power Supply Status” on page 89
.
Related Information
■
Switch Command Reference
,
shmstatus
command
■
Switch Command Reference
,
i2ctest
command
■
Switch Command Reference
,
showpresent
command
■
“Verify the Power Supply Status” on page 89
■
“Verify the Fabric Card Status” on page 97
■
“Verify the Line Card Status” on page 104
■
“Check Link Status” on page 116
▼
Identify the CMC Addresses
1. Identify the prerequisite and subsequent tasks you must perform in
conjunction with this procedure, to install the switch.
See the table in
“Installation Sequence” on page 20
2. Use this table to provide the IPMB address for a CMC in a particular slot.
3. Display and record the CMC FRU ID information.
See
“Display the CMC FRU ID Information” on page 88
.
#
showpresent
Slot Number
IPMB Address
(in hexadecimal)
0
10
1
12