Install the Battery
112
Sun Netra T5440 Server • September 2015
Install the Battery
Before You Begin
Note -
The battery is a CR-1225 or equivalent.
1.
Remove the replacement battery from its packaging.
2.
Carefully press the new battery in the slot (
3.
Chapter 6, “Returning the Server to Operation”
online.
4.11 Replacing the SCC Module
This section describes how to remove install the system SCC module on the motherboard.
Note -
The SCC module is also known as the IDPROM chip.
Caution -
This procedure must be performed by a certified Sun Oracle Service Technician only.
Caution -
The SCC module contains system host ID, MAC addresses, and configuration
variable settings for ILOM. If you are replacing a motherboard, you must move the SCC
module from the old motherboard to the new one.
Remove the SCC Module
1.
Back up OpenBoot PROM variables with one of the following procedures:
■
For ILOM 3.0 Web Interface: Back up per Chapter 10, “Backing Up and Restoring ILOM
Configuration,” from the
Oracle Integrated Lights Out Manager (ILOM) 3.0 Web Interface
Procedure Guide
(820-0052) available at:
http://docs.oracle.com/cd/E19860-01/
. Use a passphrase to backup the OpenBoot PROM variables.
■
For ILOM 3.0 CLI: Back up per Chapter 10, “Backing Up and Restoring ILOM
Configuration,” from the
Oracle Integrated Lights Out Manager (ILOM) 3.0 CLI Procedure
Guide
(821-1611) available at:
http://docs.oracle.com/cd/E19860-01/index.html
. Use
a passphrase to backup the OpenBoot PROM variables.
■
For ILOM 2.0: The ILOM Back up/Restore feature is absent. Record output from the
OpenBoot PROM
printenv
command or the Oracle Solaris
eeprom
command for use after
motherboard replacement.
Summary of Contents for Sun Netra T5440
Page 1: ...Part No E27132 03 September 2015 Sun Netra T5440 Server Service Manual ...
Page 2: ......
Page 10: ...10 Sun Netra T5440 Server September 2015 ...
Page 56: ...56 Sun Netra T5440 Server September 2015 ...
Page 128: ...128 Sun Netra T5440 Server September 2015 ...