72
Sun Network QDR InfiniBand Gateway Switch Service Manual for Firmware Version 2.1 • March 2013
■
If you are disconnecting all cables for gateway replacement, repeat from
Step 4
for all cables.
Related Information
■
“Remove a Power Supply” on page 47
■
“Remove a Fan” on page 60
■
“Remove the Gateway From the Rack” on page 77
■
“Replace the Battery” on page 78
▼
Install a Data Cable
Note –
These instructions are valid for InfiniBand and Ethernet data cables. Refer to
Gateway Installation
, assembling the optical fiber data cables, for instructions how to
assemble InfiniBand and Ethernet data cables that require assembly.
1. Identify the prerequisite and subsequent service tasks you must perform in
conjunction with this procedure.
See
“Servicing Data Cables” on page 65
.
2. Determine your next steps:
■
If you are cabling an entire gateway after a replacement procedure, locate the
cable for the connector 0B and go to
Step 6
.
■
If you are installing a replacement cable to the gateway, start the procedure at
Step 3
.
3. If necessary, assemble the data cable.
Refer to
Gateway Installation
, assembling the optical fiber data cables.
4. Inspect the replacement data cable.
See
“Inspecting the Data Cables” on page 65
.
5. Bring the replacement cable to the gateway.
6. Feed the cable through the cable management hardware.
7. Orient the cable connector to the QSFP receptacle squarely and horizontally.
Ensure that the L groove is up for the top row of receptacles, or that the L groove
is down for the bottom row of receptacles.