Exit Oracle ILOM
The Network Configuration Test screen appears.
2.
Select Ping or Ping6 from the Test Type list box.
Choose a Ping test for an IPv4 network configuration. Choose a Ping6 test for an IPv6 network
configuration.
3.
Type the IPv4 or IPv6 test destination address in the Destination field and click
Test.
If the test was successful, a “Ping of
ip_address
succeeded” message appears below the
Destination field in the Network Configuration Test screen.
Exit Oracle ILOM
To end an Oracle ILOM session:
■
From the Oracle ILOM CLI, type
exit
at the CLI prompt.
■
From the Oracle ILOM web interface, click the Log Out button at the top-right
corner of the screen.
Connecting to Oracle ILOM
67
Summary of Contents for SUN X4-8
Page 1: ...Sun Server X4 8 Installation Guide Part No E40305 07 December 2015 ...
Page 2: ......
Page 12: ...12 Sun Server X4 8 Installation Guide December 2015 ...
Page 24: ...24 Sun Server X4 8 Installation Guide December 2015 ...
Page 30: ...30 Sun Server X4 8 Installation Guide December 2015 ...
Page 70: ...70 Sun Server X4 8 Installation Guide December 2015 ...
Page 80: ...80 Sun Server X4 8 Installation Guide December 2015 ...
Page 126: ...126 Sun Server X4 8 Installation Guide December 2015 ...
Page 138: ...138 Sun Server X4 8 Installation Guide December 2015 ...
Page 144: ...144 Sun Server X4 8 Installation Guide December 2015 ...
Page 154: ...154 Sun Server X4 8 Installation Guide December 2015 ...