Preparing for Cooling
Low Voltage
High Voltage
PDU A
PDU B
Warning (Amps)
Alarm (Amps)
Warning (Amps)
Alarm (Amps)
M1-2
M2-2
17
22
8
10
M1-1
M2-1
17
22
10
14
PDU Thresholds (Fully-Populated Racks)
TABLE 15
22kVA Single-Phase PDUs
Low Voltage
High Voltage
PDU A
PDU B
Warning (Amps)
Alarm (Amps)
Warning (Amps)
Alarm (Amps)
M1-3
M1-1
34
36
31
32
M1-2
M1-2
32
36
29
32
M1-1
M1-3
26
33
24
30
TABLE 16
24kVA 3-Phase PDUs
Low Voltage
High Voltage
PDU A
PDU B
Warning (Amps)
Alarm (Amps)
Warning (Amps)
Alarm (Amps)
M2-3
M1-3
30
35
15
18
M2-2
M1-2
31
35
17
18
M2-1
M1-1
29
35
16
18
M1-3
M2-3
25
32
14
17
M1-2
M2-2
23
29
14
17
M1-1
M2-1
23
29
10
14
Related Information
■
“PDU Power Requirements” on page 101
■
“Facility Power Requirements” on page 100
■
“Grounding Requirements” on page 100
■
“Power Consumption” on page 99
Preparing for Cooling
■
“Environmental Requirements” on page 107
■
“Heat Dissipation and Airflow Requirements” on page 107
106
Oracle SuperCluster T5-8 Owner's Guide • May 2016
Summary of Contents for SuperCluster T5-8
Page 1: ...Oracle SuperCluster T5 8 Owner s Guide Part No E40167 17 May 2016 ...
Page 2: ......
Page 11: ...Contents Index 353 11 ...
Page 12: ...12 Oracle SuperCluster T5 8 Owner s Guide May 2016 ...
Page 14: ...14 Oracle SuperCluster T5 8 Owner s Guide May 2016 ...
Page 116: ...116 Oracle SuperCluster T5 8 Owner s Guide May 2016 ...
Page 204: ...204 Oracle SuperCluster T5 8 Owner s Guide May 2016 ...
Page 228: ...228 Oracle SuperCluster T5 8 Owner s Guide May 2016 ...
Page 244: ...244 Oracle SuperCluster T5 8 Owner s Guide May 2016 ...