102
Sun SPARC Enterprise T5140 and T5240 Servers Installation Guide • December 2010
I
ILOM
command-line access, 49
ILOM,
See also
service processor
initializing the system, 54
installation instructions, optional components,
reference, 5
installing
cable management arm, 18, 28
cable requirements for, 10
DC Input power cords, 91
DC version of the server, 4
express rail kit, 69
mounting brackets, 72
servers in a rack, 19
slide rail assemblies, 15, 20
updated system firmware, 63
IP address, 8
L
LEDs, ports, and slots illustrated, 13
LEDs, ports, and slots, illustrated, 12
levers, locking,
See
"slide rail assembly locks"
locating pins for mounting brackets, 72
locations of ports, slots, and LEDs (illustration), 12,
13
locks,
See
"slide rail assembly locks"
logging into service processor
using network management port, 49, 53
using serial management port, 49
lost messages, if terminal is not connected, 11
M
map of OpenBoot PROM devices, 58
messages may be lost after 60 seconds, 11
minimum cable connections, 10
modem not for use with the SER MGT serial
management port, 36
mounting bracket
locating pins on chassis, 72
preparation for installation, 72
removing from slide rail, 72
unlocking, 72
mounting screws for rack, 23
N
netmask, 8
network management port
configuring and enabling, 47
not operational until configured, 9, 47
O
OpenBoot PROM device map, 58
optional components, installation instructions in
service manual, 5
overcurrent protection device (DC models), 83, 95
P
parity for serial terminal, no, 43
password command, 49
path names, 58
pins, mounting bracket locating, 72
port locations, illustrated, 12
ports, slots, and LEDs illustrated, 13
ports, slots, and LEDs, illustrated, 12
power cycling the system, 61
powering on the system for the first time, 41
poweroff command, 61
poweron command, 55, 56
R
removing server from rack, 40, 79
resetting the system with uadmin, 60
restricted-access location (DC models), 81
RJ-45 cable, 11
S
screws for rack mounting, 23
serial terminal settings, 43
server dismounting, 40
service processor
accessing with network management port, 53
accessing with serial management port, 49
connecting to the system console, 58
network management port not operational until
configured, 9
powering on for the first time, 43
powering on the system, 54
set command, 51
service processor,
See also
ILOM
Summary of Contents for T5140
Page 11: ...xiii Sun SPARC Enterprise T5140 and T5240 Servers Installation Guide December 2010 ...
Page 51: ...40 Sun SPARC Enterprise T5140 and T5240 Servers Installation Guide December 2010 ...
Page 91: ...80 Sun SPARC Enterprise T5140 and T5240 Servers Installation Guide December 2010 ...
Page 111: ...100 Sun SPARC Enterprise T5140 and T5240 Servers Installation Guide December 2010 ...
Page 115: ...104 Sun SPARC Enterprise T5140 and T5240 Servers Installation Guide December 2010 ...