DS 76190 BL/N
13
approximately 65-75 cm above the worktop.
2.
After confirm the installation height of the hood, and then, fix the installation hole for the hood, inner
chimney bracket and safety hole as per the hood size. Make the holes on the wall (see pic 1).
3.
Install the exhaust pipe onto the cooker hood, see pic 2.
4.
Install the chimney bracket on the chimney, see pic 3.
5.
Make the hood hang on the wall in the fixed position, adjusting the cooker hood position, fix the cooker
hood with screws (safety screws), see pic 4.
Note: The two safety vents are positioned on the back casing, with diameter of 6mm.
6.
Adjust the height of the inside chimney to the position of the inside chimney bracket and fix on it by
screw, see pic 5.
THE CLASS 1 HOOD MUST BE EARTHED
The connection should be made as follows;
BROWN
=
L (live)
BLUE
=
N (neutral)
YELLOW/GREEN
= Earth
THE CLASS 2 HOOD MUST NOT BE EARTHED
Second class hoods with the characteristics label containing the double square symbol.
The connection should be made as follows;
BROWN
=
L (live)
BLUE
=
N (neutral)