background image

IOM MANUAL

 

SA ALUMINUM STOP LOG

 

 

 

 

www.orbinox.com

 

 

EDITION 12/2017 

IOM-SA 

8.

 

TROUBLESHOOTING 

 

SYMPTOM 

CAUSE 

SOLUTION 

 

LEAKAGE  (Between  frame  and 

concrete  wall,  for  Face  Mounted  In 
Existing Channel Configuration) 

 

Concrete  Wall  does  not  meet  the 

required tolerance specification  

 

Uninstall unit, repair the concrete 

wall and re-install the unit 

 

Gaps  between  frame  and  face  of 

wall  due  to  miss-application  of 
grout fill

 

 

Grout Fill remaining gaps

 

 

LEAKAGE  (Leakage  between  frame 

and concrete wall, for Wall Mounted 
Configuration). 

 

Concrete  Wall  does  not  meet  the 

required tolerance specification  

 

Uninstall unit, repair the concrete 

wall and re-install the unit 

 

Insufficient  construction  sealant 

(refer to the GAD) 

 

Uninstall  the  unit,  clean  the 

concrete  wall,  and  apply  new 
construction  sealant  (refer  to  the 
GAD for type and quantity). 

 

Loose anchor bolts 

 

Incorrect  anchor  bolts  (refer  to  the 

GAD) 

 

Tighten anchor bolts 

 

Install  appropriate  anchor  bolts 

(refer  to  the  GAD  for  type  and 
quantity) 

 

LEAKAGE  (through  the  bottom  seal 

or between logs) 
 

 

Foreign  deposits  trapped  in 

between the frame invert and bottom 
seal or between logs 

 

Open  slightly  the  log(s)  and 

remove all foreign deposits. Check 
if seals have been damaged. 

 

Damaged bottom and/or horizontal 

seal 

 

Replace seal 

 

Not  enough  compression  between 

logs 

 

Adjust log locking system device 

 

EXCESSIVE  FORZE  REQUIRED  FOR 

OPERATION 

 

Dry seals 

 

Wet seals 

 
 

 

Summary of Contents for ALUMINUM STOP LOG SA

Page 1: ...INSTALLATION OPERATION AND MAINTENANCE MANUAL ALUMINUM STOP LOG SA...

Page 2: ...K TOLERANCES 16 1 INTRODUCTION This manual describes the recommended procedures for installation operation maintenance and safety precautions for the following Orbinox equipment o SA Aluminum Stop Log...

Page 3: ...orbinox com EDITION 12 2017 IOM SA 2 EQUIPMENT MAIN COMPONENTS ITEM DESCRIPTION 1 FRAME 2 LOG 3 VERTICAL SEAL 4 BOTTOM SEAL 5 LATERAL GUIDE 6 LOG LOCKING SYSTEM 7 SEAL AND GUIDE LOCKING SYSTEM 8 INTE...

Page 4: ...eck the equipment on delivery and report back to Orbinox any missing components within 3 days from receipt of the equipment Orbinox will not accept responsibility for loss or damage to any equipment w...

Page 5: ...NEL RECESS Step 1 Initial assessment Check that the concrete wall meets the requirements described in Section 4 Verify that all installation materials specified on the GAD are available Wooden wedges...

Page 6: ...inless steel bolts that secure the vertical guides and seals must be greased on the outside to avoid getting bonded to the concrete Step 2 Anchor the gate to the side of the channel Position the unit...

Page 7: ...www orbinox com EDITION 12 2017 IOM SA CAUTION Make sure not to get grout or any other foreign material on the gate s seals guides or stem as this may cause leakage or damage Figure 6 Figure 7 Figure...

Page 8: ...bolt and prior to drilling the hole on the other side make sure the frame is perfectly leveled Step 3 Construction sealant application Remove the unit from the wall first remove the nuts of the anchor...

Page 9: ...IOM MANUAL SA ALUMINUM STOP LOG www orbinox com EDITION 12 2017 IOM SA Figure 12 Figure 13 Figure 14...

Page 10: ...eter The maximum deviation should be width 1000 o Verify that the frame invert has been embedded in concrete Wall mounted at the end of the channel installation Verify that there are no voids between...

Page 11: ...lide Please refer to section 7 1 for detailed information about the required grease type The following equipment can be used to lift up the gate or logs o Hand pull the slide or logs are equipped with...

Page 12: ...seals and make sure they are not damaged Seals shall be replaced if damaged see section 7 2 Check tightness of all unit assembly bolts and anchor bolts Spare parts Orbinox does not recommend stocking...

Page 13: ...replacement o Step 1 Remove the log from the frame See Figure 15 part 2 o Step 2 Remove the damaged seals and replace it by the new ones See Figure 16 part 1 Add general purspose Loctite to secure the...

Page 14: ...ogs from the frame Remove the Seal and guide Locking System Remove the vertical seals and replace by the new ones For stainless steel frames the seals are secured with stainless steel retainers Secure...

Page 15: ...stall unit repair the concrete wall and re install the unit Insufficient construction sealant refer to the GAD Uninstall the unit clean the concrete wall and apply new construction sealant refer to th...

Page 16: ...mension Deviations shall be within the tolerances defined in DIN 18202 Deviation Maximun deviation Linear deviation DLx DLy DLyy DIN 18202 table 1 group 2 for DLx and DLy DIN 18202 table 1 group 5 for...