4.

 

INSTALLATION 

 

This section describes the different installation methods (See section 4.1 to 4.3). Please refer to the GAD to identify 

the installation method that is applicable to the purchased equipment. 

 

The concrete construction shall be flat, level and plumb, and shall be in accordance to DIN 18202 or equivalent 

ACI 117-06 standard (see Section 9). If necessary, use non-shrink grout in order to meet the specified standard. 
The minimum concrete strength shall be 25 MPa (3,600 PSI). 

 

The  following  procedures  are  general  installation  guidelines.  Please  refer  to  the  notes  on  the  GAD  for  specific 

information  about  the  installation  method  and  the  required  materials  (type,  size  and  quantity  of  anchor  bolts, 
construction  sealant,  etc.).  Always  follow  the  anchor  bolt  and  construction  sealant  manufacturers’  installation 
instructions. Note that, typically, construction sealant requires dry concrete surfaces for its application. 

 

Note  that  as  standard,  installation  materials  such  as  anchor  bolts,  hex-bolts  and  construction  sealant  are  not 

supplied with the equipment, unless otherwise specified. 

4.1.

 

EMBEDDED IN CONCRETE (IN THE CHANNEL RECESS)

 

 

Step 1: Initial assessment 

 

Check that the concrete wall meets the requirements described in Section 4. 

 

Verify that all installation materials specified on the GAD are available. Wooden wedges are used to center and 

level the gate in the recess prior to embedding it in concrete.  

 

Step 2: Frame alignment in the recess 

 

Position and center the unit in the recess of the wall, using wooden wedges. 

 

Align the unit vertically and make sure that the frame is flush with the invert 

of the channel. The frame includes two threaded holes, which must be used to 
secure vertical alignment supports (see 

Figure  3

). Note that the supports are 

not  supplied,  unless  otherwise  specified  (two  metal  or  wooden  plates  are 
required). 

 

Align the unit horizontally and make sure that the Frame Guide is flush with 

the channel side wall. Additionally, make sure that the gate is perpendicular 
to  the  side  walls  of  the  channel  (See 

Figure

  3).  For  aluminum  frames,  use 

wooden wedges to center the unit in the recess. As an option, stainless steel 
frames include “Lateral Centering Fittings”. In that case, adjust the hex bolts 
for centering the frame. 
 
Step 3: Frame embedment in the wall recess 

 

Pour  the  second  phase  of  concrete.  Take  special  care  not  to  damage  the 

seals (see 

Figure 4

). 

 

Do not pour in more than one meter concrete columns to avoid damage to 

the frame. 

 

Remove the frame tensioning top beam if applicable. 

 

Figure 2

 

Summary of Contents for ALUMINUM STOP LOG SA

Page 1: ...INSTALLATION OPERATION AND MAINTENANCE MANUAL ALUMINUM STOP LOG SA...

Page 2: ...K TOLERANCES 16 1 INTRODUCTION This manual describes the recommended procedures for installation operation maintenance and safety precautions for the following Orbinox equipment o SA Aluminum Stop Log...

Page 3: ...orbinox com EDITION 12 2017 IOM SA 2 EQUIPMENT MAIN COMPONENTS ITEM DESCRIPTION 1 FRAME 2 LOG 3 VERTICAL SEAL 4 BOTTOM SEAL 5 LATERAL GUIDE 6 LOG LOCKING SYSTEM 7 SEAL AND GUIDE LOCKING SYSTEM 8 INTE...

Page 4: ...eck the equipment on delivery and report back to Orbinox any missing components within 3 days from receipt of the equipment Orbinox will not accept responsibility for loss or damage to any equipment w...

Page 5: ...NEL RECESS Step 1 Initial assessment Check that the concrete wall meets the requirements described in Section 4 Verify that all installation materials specified on the GAD are available Wooden wedges...

Page 6: ...inless steel bolts that secure the vertical guides and seals must be greased on the outside to avoid getting bonded to the concrete Step 2 Anchor the gate to the side of the channel Position the unit...

Page 7: ...www orbinox com EDITION 12 2017 IOM SA CAUTION Make sure not to get grout or any other foreign material on the gate s seals guides or stem as this may cause leakage or damage Figure 6 Figure 7 Figure...

Page 8: ...bolt and prior to drilling the hole on the other side make sure the frame is perfectly leveled Step 3 Construction sealant application Remove the unit from the wall first remove the nuts of the anchor...

Page 9: ...IOM MANUAL SA ALUMINUM STOP LOG www orbinox com EDITION 12 2017 IOM SA Figure 12 Figure 13 Figure 14...

Page 10: ...eter The maximum deviation should be width 1000 o Verify that the frame invert has been embedded in concrete Wall mounted at the end of the channel installation Verify that there are no voids between...

Page 11: ...lide Please refer to section 7 1 for detailed information about the required grease type The following equipment can be used to lift up the gate or logs o Hand pull the slide or logs are equipped with...

Page 12: ...seals and make sure they are not damaged Seals shall be replaced if damaged see section 7 2 Check tightness of all unit assembly bolts and anchor bolts Spare parts Orbinox does not recommend stocking...

Page 13: ...replacement o Step 1 Remove the log from the frame See Figure 15 part 2 o Step 2 Remove the damaged seals and replace it by the new ones See Figure 16 part 1 Add general purspose Loctite to secure the...

Page 14: ...ogs from the frame Remove the Seal and guide Locking System Remove the vertical seals and replace by the new ones For stainless steel frames the seals are secured with stainless steel retainers Secure...

Page 15: ...stall unit repair the concrete wall and re install the unit Insufficient construction sealant refer to the GAD Uninstall the unit clean the concrete wall and apply new construction sealant refer to th...

Page 16: ...mension Deviations shall be within the tolerances defined in DIN 18202 Deviation Maximun deviation Linear deviation DLx DLy DLyy DIN 18202 table 1 group 2 for DLx and DLy DIN 18202 table 1 group 5 for...