OPERATIONAL INSTRUCTIONS
MAINTENANCE
The safety and integrity designed into the 2 in 1 Rower / Recumbent Bike can only be maintained
when the 2 in 1 Rower / Recumbent Bike is regularly examined for damage and wear. Special
attention should be given to the following:
1. Adjust the TENSION KNOB(27) and verify that the Magnetic System provides tension. The
Magnetic System should provide many years of use.
2. Clean the roller tracks in the RAIL(52) with an absorbent cloth.
3. It is the sole responsibility of the user / owner to ensure that regular maintenance is performed.
4. Verify that all nuts and bolts are present and properly tightened. Replace missing nuts and bolts.
Tighten loose nuts and bolts.
5. Worn or damaged components shall be replaced immediately or the 2 in 1 Rower / Recumbent
Bike removed form service until repair is made.
6. Keep your 2 in 1 Rower / Recumbent Bike clean by wiping with an absorbent cloth after use.
15
Summary of Contents for T6610
Page 17: ...17 ...