Operating instructions REB 6, REB 14, REB 20
5 Commissioning
orbitalum tools
gmbh
(06.10)
MT_REB 6_REB 14_REB 20_BA_04_790093762_02.doc
13
5 Commissioning
5.1
Checking the parts of delivery
Check all parts of the delivery for completeness and transportation damage.
Report any missing parts or transportation damage to your supplier
immediately.
5.1.1
Included with the machine*
1 Pipe End Preparation Machine REB
1 Transportation box
1 Clamping chuck (REB 6 and REB 14)
or
2 Clamping chucks (REB 20)
5 Clamping sets, each with 3 clamping wedges (on REB 6)
or
6 Clamping sets, each with 3 clamping wedges (REB 14 and REB 20)
1 Tool set
1 Cutting lubricant spray KSS-TOP
1 Operating instructions and 1 spare parts list
* Subject to modifications
5.2
Requirements on the compressed air system
The compressed air system must meet the following requirements for
interference-free working with the REB:
The following air capacities must be supplied by the compressed air
network (see also chapter 4, p. 12 „Technical specifications“):
70 cfm – 90 psi
A maintenance unit with lubricator, water collector and pressure reducer
must be installed upstream of the REB.
The compressed air line from the maintenance unit to the REB must not be
more than 5 m long.
5.3
Mains connection for electrical drive
Single-phase alternating current 230 V, 50/60 Hz or 120 V, 50/60 Hz,
protection class I (see also chapter 4, p. 12 „Technical specifications“).
Mains fuse, minimum rating 10 A
Summary of Contents for REB 14
Page 39: ......