DP-100SL
43
Site Preparation Guide
Appendix B
Customer Site Preparation
Checklist
Safety Issues
Complete
Pending
Date
Notes
A red warning light installed outside the imager
room, above the entrance.
Portable carbon dioxide fire extinguishers near the
system.
Imager room has fireproof walls and furniture.
Protective goggles available in imager room.
Compressed Air Issues
Complete
Pending
Date
Notes
Air line pressure: 0.7 ~ 1.0 MPa (7 - 10 bar)
Air supply rate of 55 liters/minute
Quality: dry (water 0.03 g/m
³
)
filtered (dust: 0.1µm, 0.1 mg/m
³
)
free of oil (oil: 0.01 mg/m
³
)
10 mm
φ
tube connectors
Summary of Contents for DP-100SL
Page 1: ...DP 100SL Site Preparation Guide October 2003 Revision A ...
Page 2: ......
Page 14: ......
Page 18: ......
Page 25: ...DP 100SL 19 Site Preparation Guide Figure 3 2 System Dimensions Front View ...
Page 26: ...20 Chapter 3 Facility Physical Requirements Figure 3 3 System Dimensions Side View ...
Page 27: ...DP 100SL 21 Site Preparation Guide Figure 3 4 Site Dimensions Standard Configuration ...
Page 32: ......
Page 40: ......
Page 48: ......