DP-100SL
47
Site Preparation Guide
Furniture Issues (Cont.d)
Complete
Pending
Date
Notes
The feet of the furniture are not insulated from the
ground.
All furniture surfaces have a non-reflective matte
finish.
Access and Transport Issues
Complete
Pending
Date
Notes
Easy access for movement of crates, through the
hallways, to the imaging room from the storage
room.
Unpacking space outside the work area.
Forklift and crane available for movement and
installation.
Communications Issues
Complete
Pending
Date
Notes
Four ethernet network connection points are
available near the system.
A phone line with IDD is installed near the system.
A second phone line with IDD is installed for
remote diagnostics via modem.
Sun Workstation Issues
Complete
Pending
Date
Notes
Table-top space is allocated for workstation.
A 1KW UPS is recommended.
Summary of Contents for DP-100SL
Page 1: ...DP 100SL Site Preparation Guide October 2003 Revision A ...
Page 2: ......
Page 14: ......
Page 18: ......
Page 25: ...DP 100SL 19 Site Preparation Guide Figure 3 2 System Dimensions Front View ...
Page 26: ...20 Chapter 3 Facility Physical Requirements Figure 3 3 System Dimensions Side View ...
Page 27: ...DP 100SL 21 Site Preparation Guide Figure 3 4 Site Dimensions Standard Configuration ...
Page 32: ......
Page 40: ......
Page 48: ......