2.5 PRECAUTIONS
2.5.1 Know your machine
Know your machine. Learn all the functions and actuating mechanisms, and familiarize where the emer-
gency stop switches are located. Learn the machines capacity and limitations, to avoid unnecessary down-
time and mechanical brake-down.
IMPORTANT: If any dangerous situations occur, shut down the power take off (PTO) right away.
2.5.2 Equipment control
Before starting up, make sure that the machine and its equipment is in place and in good working order!
See
chapter 7 "Maintenance and mechanical adjustments"
.
2.5.3 Cleaning
A good cleaning of the machine increases durability and safety. Therefore, keep all surfaces clean, remove
dirt, oil-spills and other remains.
2.5.4 Environmental protection
Hazardous waste, such as rubber, oil and other materials that could harm the environment, must be dis-
posed at approved disposal centres.
2.6 BREAK-IN PERIOD
Check
Check points
Do not run compactor at maximum capacity the first 25 hours of operation
Be observant – monitor that functions are working correctly.
Check for abnormal sounds from the machinery
Fine tune the process to be carried out so that the compactor can reach maximum capa-
city, based on material being baled.
2 SAFETY
20
Summary of Contents for Dens-X Compactor
Page 14: ...1 6 DECLARATION OF CONFORMITY 1 GENERAL 14...
Page 103: ...8 7 MANUAL LUBRICATION CHARTS 8 7 1 The compactor 8 LUBRICATION 103...
Page 104: ...8 7 2 Feed hopper F25 8 LUBRICATION 104...
Page 105: ...8 7 3 Flexible drawbar 8 LUBRICATION 105...
Page 109: ...10 1 MAIN POWER SUPPLY E STOP SWITCHES AND ELECTRICAL CABINET 10 ELECTRICS 109...
Page 110: ...10 2 ELECTRICAL CABINET POWER SUPPLY RAIL 10 ELECTRICS 110...
Page 111: ...10 3 SENSORS AND MANUAL CONTROLS 10 ELECTRICS 111...
Page 112: ...10 4 VALVES FAN MOTORS AND PUMPS 10 ELECTRICS 112...
Page 124: ...10 9 SENSOR OVERVIEW 10 ELECTRICS 124...
Page 128: ...11 1 1 Complete diagram 11 HYDRAULICS 128...
Page 129: ...11 1 2 Wrapping table chamber and elevator control 11 HYDRAULICS 129...
Page 130: ...11 1 3 Plastic tying unit sub conveyor and feed hopper 11 HYDRAULICS 130...
Page 131: ...11 1 4 Additional feed hopper control for F25 and chamber drive 11 HYDRAULICS 131...
Page 133: ...11 2 VALVE OVERVIEW 11 2 1 Valve chart for Dens X 11 HYDRAULICS 133...
Page 137: ...12 6 3 Dimensional sketch F25 operating mode 12 SPECIFICATIONS 137...
Page 138: ...12 6 4 Dimensional sketch F25 transport mode 12 SPECIFICATIONS 138...
Page 142: ...M Maintenance 13 69 71 INDEX 142...