IG-284-EN version 03; 06/05/2020
15
General Instructions
cgm
.800: Medium-voltage switchgear with integrated insulation in SF
6
gas
up to 36 kV in accordance with IEC Standard with rated current up to 800 A
Installation
4. Installation
4.1. Unpacking the equipment
[4]
It is advisable to cut the cellophane at the rear of the cubicle or at the corner to avoid scratching the surface.
The
cgm
.800 system switchgear is supplied as standard
protected by plastic packaging.
On receiving the equipment, check that the goods supplied
correspond to the order and associated documentation. If
this is not the case, contact
Ormazabal
immediately.
The disassembly process for the equipment is as follows:
1.
Using a blade, cutter or similar tool, cut the cellophane
the cubicle is wrapped in.
[4]
2.
Completely remove the cellophane.
3.
Detach the white polystyrene corner pieces.
4.
Unscrew the fixings between the base and the pallet.
5.
Remove the pallet, handling the cubicle as indicated in
section 2.1.
6.
Unpack the accessory box located at the rear or on top
of the cubicle.
7.
Remove the self-adhesive protective plastic from the
cable compartment cover.
The self-adhesive plastic must be removed from the
cable compartment cover so that the equipment
enclosure's earth connection may have the proper
electrical continuity.
8.
Dispose of any waste in an environmentally friendly
manner.
It is advisable to make a visual inspection of the equipment
to check whether it has suffered any damage in transit. If
damaged, contact
Ormazabal
immediately.
4.2. Location of accessories during transport
A number of accessories are supplied with the cubicles,
located as indicated in the figures below:
Figure 4.1.
Location of accessories in
cgm
.800-p
cubicles
Figure 4.2.
Location of accessories in
cgm
.800-l
and
cgm
.800-v
cubicles