Installation
General instructions
cpg
.0: GIS medium-voltage switchgear,
gas insulated, up to 40.5 kV,
in accordance with IEC Standard
6.9. Installing the gas duct to outside the cubicle room
Ormazabal
's scope of supply includes a 250 mm long
duct section from the side panel. In general, supply
and assembly of the rest of the ducts are not included
in
Ormazabal
's scope of supply.
Figure 6.19.
Section of gas duct included in
Ormazabal
's
scope of supply (shaded in grey)