Section 5 - Attachments and Hitches
5-41
31200205
To open/close bucket gate:
Press and hold button (
3
) to close bucket gate or press and hold button (
4
) to open
bucket gate.
OR
While pressing and holding button (
5
), move joystick forward to close bucket gate or
move joystick back to open bucket gate.
Installation Procedure:
• Ensure carriage is properly installed. Refer to
• Secure the concrete bucket to the forks by sliding the concrete bucket onto the
parent forks and install the retaining pin behind the vertical shank of the fork.
Operation:
• Close bucket gate, level bucket and fully retract and lower boom to load material.
• Distribute material evenly within the bucket. Bucket capacity charts are for evenly
distributed loads only.
• Load center will vary depending on the amount of material in the bucket. Always
ensure compliance with the capacity chart.
• Travel in accordance with requirements set forth in Section 1 - General Safety
• Position bucket and open bucket gate to release load.
Equipment Damage Precautions
• Transport the concrete bucket as low as practical at a slow speed and without
rapid side to side movement.
Summary of Contents for JLG 3508PS
Page 2: ......
Page 26: ...Section 1 General Safety Practices 1 14 31200205 This Page Intentionally Left Blank...
Page 45: ...Section 3 Controls and Indicators 3 9 31200205 This Page Intentionally Left Blank...
Page 68: ...Section 3 Controls and Indicators 3 32 31200205 This Page Intentionally Left Blank...
Page 85: ...Section 5 Attachments and Hitches 5 5 31200205 This Page Intentionally Left Blank...
Page 139: ...Section 7 Lubrication and Maintenance 7 7 31200205 17M OZ2430 EVERY 8...
Page 141: ...Section 7 Lubrication and Maintenance 7 9 31200205 17M OZ2440 2X 50 EVERY...
Page 160: ...Section 8 Additional Checks 8 6 31200205 This Page Intentionally Left Blank...
Page 174: ...Inspection Maintenance and Repair Log Date Comments...
Page 176: ......
Page 177: ......