Section 5 - Attachments and Hitches
5-20
31200205
Hydraulic Operated Attachment
1. Install attachment (see page 5-13 or 5-18).
2. Lower attachment to ground.
3. Quickly depress and release continuous auxiliary hydraulics switch (
1
) twice.
Depress again and hold to relieve pressure at both auxiliary fittings (
2
).
Note:
Depressing of auxiliary hydraulics switch three times must be accomplished
within two seconds. If buzzer sounds or continuous auxiliary hydraulics indicator
illuminates, repeat step 3.
4. Perform
5. Connect attachment hoses to both auxiliary fittings.
Platform Attachment (If Equipped)
1. Install platform (see page 5-13) and connect hydraulic lines (see above).
2. With the park brake applied and engine off, remove connector cover (
3
) and
connect electric cable (
4
) from the platform.
O
Z222
0
2
O
Z
06
32
1
O
Z2
861
3
4
Summary of Contents for JLG 3508PS
Page 2: ......
Page 26: ...Section 1 General Safety Practices 1 14 31200205 This Page Intentionally Left Blank...
Page 45: ...Section 3 Controls and Indicators 3 9 31200205 This Page Intentionally Left Blank...
Page 68: ...Section 3 Controls and Indicators 3 32 31200205 This Page Intentionally Left Blank...
Page 85: ...Section 5 Attachments and Hitches 5 5 31200205 This Page Intentionally Left Blank...
Page 139: ...Section 7 Lubrication and Maintenance 7 7 31200205 17M OZ2430 EVERY 8...
Page 141: ...Section 7 Lubrication and Maintenance 7 9 31200205 17M OZ2440 2X 50 EVERY...
Page 160: ...Section 8 Additional Checks 8 6 31200205 This Page Intentionally Left Blank...
Page 174: ...Inspection Maintenance and Repair Log Date Comments...
Page 176: ......
Page 177: ......