Section 4 - Operation
4-9
31200205
Placing a Suspended Load
Before placing any load be sure that:
• The landing point can safely support the weight of the load.
• The landing point is level; front to back and side to side.
• Use the capacity chart to determine safe boom extension range. See
• Align load at the level load is to be placed, then position boom slowly until load is
just above area where it is to be placed.
• Ensure that the guide persons and operator remain in constant communication
(verbal or hand) when placing the load.
Disengaging a Suspended Load
• Never place the guide persons between the suspended load and the telehandler.
• Once at the destination of the load, ensure to bring the telehandler to a complete
stop and apply the park brake prior to disengagement of the lifting devices and
the tethers.
Summary of Contents for JLG 3508PS
Page 2: ......
Page 26: ...Section 1 General Safety Practices 1 14 31200205 This Page Intentionally Left Blank...
Page 45: ...Section 3 Controls and Indicators 3 9 31200205 This Page Intentionally Left Blank...
Page 68: ...Section 3 Controls and Indicators 3 32 31200205 This Page Intentionally Left Blank...
Page 85: ...Section 5 Attachments and Hitches 5 5 31200205 This Page Intentionally Left Blank...
Page 139: ...Section 7 Lubrication and Maintenance 7 7 31200205 17M OZ2430 EVERY 8...
Page 141: ...Section 7 Lubrication and Maintenance 7 9 31200205 17M OZ2440 2X 50 EVERY...
Page 160: ...Section 8 Additional Checks 8 6 31200205 This Page Intentionally Left Blank...
Page 174: ...Inspection Maintenance and Repair Log Date Comments...
Page 176: ......
Page 177: ......