SECTION 4 - BOOM & PLATFORM
3121827
– JLG Lift –
4-5
Installation
NOTE:
Coat I.D. of bushings with specified lubricant prior to
installing pins.
1.
With the booms positioned and supported, place
cylinder in position and secure in place using slings.
2.
Install the cylinder barrel pin #4, being sure to align
the hole in the cylinder barrel pin with the retaining
pin screw hole. When holes align, install hardware.
3.
Correctly install hydraulic lines to cylinder as previ-
ously tagged. Extend cylinder rod slowly until attach
pin hole aligns with those in boom.
4.
Using a suitable brass drift, drive the cylinder rod
attach pin #3 through the aligned holes. Secure the
pin in place using retaining hardware.
5.
Remove boom prop and overhead crane. Take the
lift cylinder through one complete cycle to assure
correct functioning. Place boom in stowed position.
Check hydraulic fluid and adjust accordingly.
4.4 LOWER BOOM LIFT CYLINDER
Removal
1.
Place machine on flat and level surface. Place the
Upper Boom in a horizontal position. Place the Mid
and Lower Booms in a 10 degree elevated position.
Support Upper Boom with a prop. Support upright
with an overhead crane.
2.
Using slings, restrain the lower lift cylinder.
3.
Remove the hardware securing the cylinder rod
attach pin #5 to the boom. Using an appropriate
brass drift, drive out the cylinder rod attach pin #5.
4.
Tag, disconnect and cap the lift cylinder hydraulic
lines and ports.
5.
Remove the hardware securing the barrel end attach
pin #6 to the boom. Using an appropriate brass
drift, drive out the cylinder barrel pin #6.
6.
Carefully remove cylinder from boom. Place in a
suitable work area.
Installation
NOTE:
Coat I.D. of bushings with specified lubricant prior to
installing pins.
1.
With the booms positioned and supported, place
cylinder in position and secure in place using slings.
2.
Install the cylinder barrel pin #6, being sure to align
the hole in the cylinder barrel pin with the retaining
pin screw hole. When holes align, install hardware.
3.
Correctly install hydraulic lines to cylinder as previ-
ously tagged. Extend cylinder rod slowly until attach
pin hole aligns with those in boom.
4.
Using a suitable brass drift, drive the cylinder rod
attach pin #5 through the aligned holes. Secure the
pin in place using retaining hardware.
5.
Remove boom prop and overhead crane. Take the
lift cylinder through one complete cycle to assure
correct functioning. Place boom in stowed position.
Check hydraulic fluid and adjust accordingly.
Figure 4-4. Lower Boom Lift Cylinder Removal
Summary of Contents for JLG E400AJP
Page 2: ......
Page 32: ...SECTION 1 SPECIFICATIONS 1 18 JLG Lift 3121827 NOTES...
Page 42: ...SECTION 2 GENERAL 2 10 JLG Lift 3121827 NOTES...
Page 54: ...SECTION 3 CHASSIS TURNTABLE 3 12 JLG Lift 3121827 Figure 3 3 Speed Sensor Orientation...
Page 60: ...SECTION 3 CHASSIS TURNTABLE 3 18 JLG Lift 3121827 Figure 3 7 Steering Components and Spindles...
Page 62: ...SECTION 3 CHASSIS TURNTABLE 3 20 JLG Lift 3121827 Figure 3 9 Tilt Sensor Location...
Page 86: ...SECTION 3 CHASSIS TURNTABLE 3 44 JLG Lift 3121827 Figure 3 16 Swing Components...
Page 88: ...SECTION 3 CHASSIS TURNTABLE 3 46 JLG Lift 3121827 Figure 3 18 Battery Cable Connections...
Page 90: ...SECTION 3 CHASSIS TURNTABLE 3 48 JLG Lift 3121827 Figure 3 20 On Board Generator...
Page 97: ...SECTION 3 CHASSIS TURNTABLE 3121827 JLG Lift 3 55 Figure 3 22 Generator Components...
Page 116: ...SECTION 3 CHASSIS TURNTABLE 3 74 JLG Lift 3121827 NOTES...
Page 127: ...SECTION 4 BOOM PLATFORM 3121827 JLG Lift 4 11 Figure 4 10 Boom Limit Switches...
Page 140: ...SECTION 4 BOOM PLATFORM 4 24 JLG Lift 3121827 Figure 4 13 Rotator Counterbalance Valve...
Page 178: ...SECTION 5 HYDRAULICS 5 24 JLG Lift 3121827 Figure 5 26 HydraForce Cartridge Torque Value Chart...
Page 214: ...SECTION 6 JLG CONTROL SYSTEM 6 34 JLG Lift 3121827 NOTES...
Page 257: ......