SECTION 3 - CHASSIS & TURNTABLE
3121827
– JLG Lift –
3-5
Disassembly
1.
Loosen and remove hex head bolts (53) to remove
cover (51).
2.
Remove shaft rod (56) and “o” ring (54).
3.
Remove sleeve (52).
Disassembly of the first stage planetary
assembly (7)
1.
Push sun gear shaft (43) out of the first stage.
2.
Remove snap rings (14).
3.
Press planet pins (5) out of the planet gears (2).
4.
Pull cylindrical roller bearing (10) out of the planet
gears (2).
5.
Remove snap ring (16) from sun gear (3) and
Remove planet carrier (7) from sun gear (3).
6.
Remove thrust washer (49).
Disassembly of second stage planet gears
(1)
1.
Press cylindrical roller bearings out of planet gears
(1).
Assembly of first stage planetary assembly
(7)
1.
Pre-freeze planet pins (5) and install into planet car-
rier (7).
2.
Install planet carrier (7) together with planet pins (5)
on sun gear (3), and install snap ring (16).
3.
Pre-heat thrust washer (49) and Install onto sun gear
shaft (43).
4.
Put sun gear shaft (43) into sun gear (3).
5.
Pre-heat support disk (17) and install onto planet
pins (5).
6.
Pre-heat cylindrical roller bearings (10) and install
onto planet pins (5) and fix bearings with snap rings
(14).
Assembly of end cover unit (8)
1.
Press sleeve (52) into cover (8).
2.
Install “o” ring (54) into groove of cover (8).
3.
Install shift rod (56) into cover (8).
4.
Install the cover (51) into cover (8) and fix cover (51)
with hex bolts (53). Tighten bolts with torque wrench
to 6.3 ft. lbs. (8.5 Nm).
Summary of Contents for JLG E400AJP
Page 2: ......
Page 32: ...SECTION 1 SPECIFICATIONS 1 18 JLG Lift 3121827 NOTES...
Page 42: ...SECTION 2 GENERAL 2 10 JLG Lift 3121827 NOTES...
Page 54: ...SECTION 3 CHASSIS TURNTABLE 3 12 JLG Lift 3121827 Figure 3 3 Speed Sensor Orientation...
Page 60: ...SECTION 3 CHASSIS TURNTABLE 3 18 JLG Lift 3121827 Figure 3 7 Steering Components and Spindles...
Page 62: ...SECTION 3 CHASSIS TURNTABLE 3 20 JLG Lift 3121827 Figure 3 9 Tilt Sensor Location...
Page 86: ...SECTION 3 CHASSIS TURNTABLE 3 44 JLG Lift 3121827 Figure 3 16 Swing Components...
Page 88: ...SECTION 3 CHASSIS TURNTABLE 3 46 JLG Lift 3121827 Figure 3 18 Battery Cable Connections...
Page 90: ...SECTION 3 CHASSIS TURNTABLE 3 48 JLG Lift 3121827 Figure 3 20 On Board Generator...
Page 97: ...SECTION 3 CHASSIS TURNTABLE 3121827 JLG Lift 3 55 Figure 3 22 Generator Components...
Page 116: ...SECTION 3 CHASSIS TURNTABLE 3 74 JLG Lift 3121827 NOTES...
Page 127: ...SECTION 4 BOOM PLATFORM 3121827 JLG Lift 4 11 Figure 4 10 Boom Limit Switches...
Page 140: ...SECTION 4 BOOM PLATFORM 4 24 JLG Lift 3121827 Figure 4 13 Rotator Counterbalance Valve...
Page 178: ...SECTION 5 HYDRAULICS 5 24 JLG Lift 3121827 Figure 5 26 HydraForce Cartridge Torque Value Chart...
Page 214: ...SECTION 6 JLG CONTROL SYSTEM 6 34 JLG Lift 3121827 NOTES...
Page 257: ......