SECTION 2 - USER RESPONSIBILITIES, MACHINE PREPARATION, AND INSPECTION
2-6
31217186
2.4 WALK-AROUND INSPECTION
Begin the Walk-Around Inspection at item 1 as noted on the Inspection
Diagram. Continue checking each item in sequence for the conditions
listed in the following checklist.
TO AVOID POSSIBLE INJURY, BE SURE MACHINE POWER IS “OFF”. DO NOT OPERATE
UNTIL ALL MALFUNCTIONS HAVE BEEN CORRECTED.
NOTICE
DO NOT OVERLOOK VISUAL INSPECTION OF CHASSIS UNDERSIDE. CHECKING THIS
AREA MAY RESULT IN DISCOVERY OF CONDITIONS WHICH COULD CAUSE EXTENSIVE
MACHINE DAMAGE.
INSPECTION NOTE:
On all components, make sure there are no loose or
missing parts, they are securely fastened, and no visible damage, leaks, or
excessive wear exists in addition to any other criteria mentioned.
1. Frame/Chassis/Ladder
–
Ensure pothole protection (PHP)
components on frame are in place, undamaged, not bent or
worn. Side compartment doors open and close properly.
Refer to Inspection Note.
2. Ground Control Console
–
Placard secure and legible, con
-
trol switches return to neutral position when activated and
released, emergency stop switch functions properly. Control
markings legible.
3. Hydraulic Pump/Motor, Control Valve Installation
–
No
unsupported wires or hoses; no damaged or broken wires.
Refer to Inspection Note.
4. Front Wheels and Tires –
Wheel bolts properly secured
(refer to wheel and tire information in Section 6.5). Inspect
wheels, steer linkage, and steer cylinder for damage and cor
-
rosion. Refer to Inspection Note.
5. Battery Compartment –
Refer to Inspection Note.
6. Rear Wheels and Tires –
Wheel bolts properly secured (refer
to wheel and tire information in Section 6.5). Inspect wheels,
steer linkage, and steer cylinder for damage and corrosion.
Refer to Inspection Note.
7. Platform Manual Descent –
Refer to Inspection Note.
8. Beacon (If Equipped) –
Refer to Inspection Note.
9. Scissor Arm Stack Assembly, Pivot Pins, Slide Wear Pads,
Lift Cylinder
–
Refer to Inspection Note.
10. Platform/Rail/Gate Assembly –
Deck extension slides in
and out and locks in place properly. All fold-down rail pins (if
equipped) in place and secure. Refer to Inspection Note.
11. Platform Control Console
–
Ensure the control console is
firmly secured in the proper location. Placards secure and
legible, control lever and switches return to neutral position
when activated and released, emergency stop switch func
-
tion properly, and required manuals in storage box.
12. Static Strap
–
Refer to Inspection Note.
Summary of Contents for JLG ES1330L
Page 6: ...REVISION LOG d 31217186 REVISION LOG Original Issue A January 31 2020 Revised B May 26 2020...
Page 22: ...SECTION 1 SAFETY PRECAUTIONS 1 12 31217186 NOTES...
Page 32: ...SECTION 2 USER RESPONSIBILITIES MACHINE PREPARATION AND INSPECTION 2 10 31217186 NOTES...
Page 48: ...SECTION 3 MACHINE CONTROLS INDICATORS AND OPERATION 3 16 31217186 3 10 GRADE AND SIDESLOPE 7 0...
Page 54: ...SECTION 3 MACHINE CONTROLS INDICATORS AND OPERATION 3 22 31217186 0...
Page 56: ...SECTION 3 MACHINE CONTROLS INDICATORS AND OPERATION 3 24 31217186 NOTES...
Page 60: ...SECTION 4 EMERGENCY PROCEDURES 4 4 31217186 NOTES...
Page 66: ...SECTION 5 ACCESSORIES 5 6 31217186 NOTES...
Page 81: ...SECTION 6 OPERATION SPECIFICATIONS AND MAINTENANCE 31217186 6 15 6 6 DECAL INSTALLATION 0...
Page 94: ...SECTION 6 OPERATION SPECIFICATIONS AND MAINTENANCE 6 28 31217186 NOTES...
Page 96: ...SECTION 7 INSPECTION AND REPAIR LOG 7 2 31217186 DATE COMMENTS...
Page 97: ......