SECTION 4 - MACHINE OPERATION
4-14
– JLG Lift –
3121664
4.11
SHUT DOWN AND PARK
Shut Down and Park
The procedures to shut down and park the machine are as fol-
lows:
1.
Drive machine to a reasonably well protected area.
2.
Ensure boom is lowered over rear drive axle.
3.
Shut down Emergency Stop at Platform Controls.
4.
Shut down Emergency Stop at Ground Controls. Position
Platform/Ground Select switch to center OFF.
If necessary, cover Platform Controls to protect instruction plac-
ards, warning decals, and operating controls from hostile envi-
ronment.
4.12
LIFTING AND TIE DOWN
Lifting
1.
Refer to the Serial Number Plate, refer to the Specifications
section of this manual, or weigh the individual unit to find
out the Gross Vehicle Weight.
2.
Place the boom in the stowed position.
3.
Remove all loose items from the machine.
4.
Properly adjust the rigging to prevent damage to the
machine and so the machine remains level.
Tie Down
WHEN TRANSPORTING THE MACHINE IN THE STOWED POSITION, THE BOOM MUST BE
FULLY LOWERED INTO THE BOOM REST.
1.
Place the boom in the stowed position or storage position.
2.
Remove all loose items from the machine.
3.
Secure the chassis and the platform using straps or chains of
adequate strength.
Summary of Contents for JLG 520AJ
Page 2: ......
Page 26: ...SECTION 1 SAFETY PRECAUTIONS 1 14 JLG Lift 3121664 NOTES ...
Page 60: ...SECTION 3 MACHINE CONTROLS AND INDICATORS 3 22 JLG Lift 3121664 NOTES ...
Page 68: ...SECTION 4 MACHINE OPERATION 4 8 JLG Lift 3121664 Figure 4 3 Grade and Side Slopes ...
Page 75: ...SECTION 4 MACHINE OPERATION 3121664 JLG Lift 4 15 Figure 4 5 Lifting and Tie Down Chart ...
Page 76: ...SECTION 4 MACHINE OPERATION 4 16 JLG Lift 3121664 Figure 4 6 Decal Location Sheet 1 of 6 ...
Page 77: ...SECTION 4 MACHINE OPERATION 3121664 JLG Lift 4 17 Figure 4 7 Decal Location Sheet 2 of 6 ...
Page 78: ...SECTION 4 MACHINE OPERATION 4 18 JLG Lift 3121664 Figure 4 8 Decal Location Sheet 3 of 6 ...
Page 79: ...SECTION 4 MACHINE OPERATION 3121664 JLG Lift 4 19 Figure 4 9 Decal Location Sheet 4 of 6 ...
Page 80: ...SECTION 4 MACHINE OPERATION 4 20 JLG Lift 3121664 Figure 4 10 Decal Location Sheet 5 of 6 ...
Page 81: ...SECTION 4 MACHINE OPERATION 3121664 JLG Lift 4 21 Figure 4 11 Decal Location Sheet 6 of 6 ...
Page 88: ...SECTION 5 EMERGENCY PROCEDURES 5 4 JLG Lift 3121664 NOTES ...
Page 108: ...SECTION 6 GENERAL SPECIFICATIONS OPERATOR MAINTENANCE 6 20 JLG Lift 3121664 NOTES ...
Page 110: ......
Page 111: ......