SECTION 4 - BOOM & PLATFORM
3121623
– JLG Lift –
4-7
8.
Carefully remove the telescope cylinder and
sheave assembly. Place telescope cylinder on a
suitable trestle.
a.
Remove hardware from the wear pads;
remove wear pads from cylinder.
b.
Remove hardware from the wire rope guard;
remove guard from cylinder.
c.
Remove hardware from the sheave pin;
remove pin and sheave from cylinder.
Figure 4-10.
9.
Remove hardware which secures the wear pads
to the front of base boom section; remove wear
Figure 4-9.
1.
Base Boom
2.
Mid Boom
3.
Fly Boom
4.
Telescope Cylinder
5.
Extend Sheave
6.
Retract Sheave
7.
Sheave Block
8.
ExTend Cable
9.
Retract Cable
10.
Extend Cable Adjustment
11.
Retract Cable Adjustment
12.
Proximity Switch
13.
Wear Pad
14.
Wear Pad
1
13
3
2
4
7
5
8
11
Go
to
Discount-Equipment.com
to
order
your
parts