Ones Stop Systems
EB7-X8G2-RAS | 2 Hardware Installation
15
2.5 Applying Power Correctly
2.5.1 Starting Up
You must apply power to the EB7-X8G2-RAS expansion chassis
UUU
BEFORE
UUU
you power up your computer. This will allow the higher numbered PCIe
buses in the PCIe bus hierarchy to be at a stable state when the host system issues its master power-on bus reset. Each of the redundant power
supply units has its own power switch as well as an LED to indicate its power status
After first turning on each of the individual power switches in the back of the chassis, the entire system can then be turned on using the master
power switch in the front.