-3-
-4-
DESCRIPTION OF THE APPLIANCE
1. Nozzle Bristle Brush
2. Nozzle Holder
3. Nozzle Ceramic Faceplate
4. Nozzle Steam Vents
5. Collapsible Hanger
6. Hanger Shafts
7. Hanger Locking/Unlocking Fasteners
8. Hanger Tab (contains the tab cavities)
9. Hanger Clips
10. Nozzle Handle
11. Upper Rod
12. Two Rod-Locking Latches
13. Middle Rod
14. 1.5-Meter Flexible Hose
15. Lower Rod
16. On/Off “I/O” Switch
17. Rod-Locking Nut
18. Rod Receptacle
19. Removable 1.8-Liter Water Tank
20. Hose Connector
21. Hose Receptacle
22. Water Tank Cap (located under the
Removable 1.8-Liter Water Tank, not
shown)
23. 4 Wheels
24. Drainage Plug (located under the unit,
not shown)
1
3
5
7
9
11
13
14
20
21
4
6
8
10
12
15
18 19
17
16
22
23
24
2
ASSEMBLING THE GARMENT STEAMER
1. Remove all parts from the packaging.
2. Remove any plastic bags and stickers from the parts.
3. Place unit housing on the floor sitting on its wheels.
4. Attach the rod into the rod receptacle on the unit. Make
sure the rod-locking nut is loose. To make it loose,
untighten it by turning it counterclockwise.
5. Once the rod is inserted, tighten the rod-locking nut by
turning it clockwise until rod is tightly secured in place.
6. Unlock the two rod-locking latches and raise the rods to
your desired height. Secure the rod into place by locking
the rod-locking latches located on the lower and middle
rods.
7. Insert the hose connector into the hose receptacle by
aligning the tabs in the hose connector with the grooves
located on the hose receptacle. Once inserted, turn the
connector counterclockwise until it is locked in place.
8. Raise the two arms of the collapsible garment hanger and
fit the tips of the two hanger shafts into the tab cavities
(located on the hanger tab) and then slide the hanger
locking/unlocking fasteners all the way to lock the hanger
shafts in place.
9. Place the nozzle on the nozzle holder.
10. The unit is now assembled.
GCSTGS5011-049_15EM3.indd 3-4
5/20/15 11:19 AM