background image

15/17

OSTO LEIPZIG 34

98

%

IF DOOR IS TILTED,

PUSH THE 

DOOR

 FRAME SO

THAT

 ALL CORNERS ARE 90º.

90º

90º

Summary of Contents for LEIPZIG 34

Page 1: ...15 12 270 15 5 70 4 50 6 140 M8 70 3 mm 4 mm 5 mm 8 mm 90 4 40 1 17 OSTO LEIPZIG 34 PREPARE THE GROUND UNWRAP THE PACKAGE LAY OUT THE COMPONENTS FIND THE TOOLS...

Page 2: ...THAT THE BOTTOM LOGS ARE INSTALLED ON A LEVEL SURFACE CHECKING ALL DIRECTIONS INCLUDING CORNER TO CORNER 2 LAY OUT THE BOTTOM LOGS AND SQUARE IT BY MEASURING FROM CORNER TO CORNER A LG 1 B LG 1 A C D...

Page 3: ...4 5 70 4 mm 3 17 OSTO LEIPZIG 34 ATTACH THE LOGS WITH SCREWS 3...

Page 4: ...4 5 70 4 mm 4 6 140 5 mm 4 17 OSTO LEIPZIG 34 5 ATTACH THE FIRST ROW OF WALL LOGS INTO THE BOTTOM LOGS WITH SCREWS 1 LG 5 2 LG 2 2 LG 2 6 140 5 70...

Page 5: ...5 17 OSTO LEIPZIG 34 12 AFTER PLACING 3 4 ROWS OF WALL LOGS TAP EACH WALL LOG IN PLACE USING A HAMMER AND THE HITBLOCK PROVIDED TO TIGHTEN THE LOGS HITBLOCK...

Page 6: ...6 17 OSTO LEIPZIG 34 13 SLIDE THE DOOR IN ATTACH THE HANDLE B34DD1 3 LOGS IN PLACE...

Page 7: ...7 17 OSTO LEIPZIG 34 26 DON T FORGET TO TIGHTEN THE LOGS AFTER EVERY 3 4 ROWS HITBLOCK...

Page 8: ...4 6 140 5 mm 8 17 OSTO LEIPZIG 34 42 INSTALL THE GABLES WITH LONG SCREWS TO THE WALL LOGS ON THE FRONT AND REAR WALLS 15 LOGS IN PLACE GABLE B TL 1 A TL 1 A LG 2 B LG 2...

Page 9: ...6 6 140 5 mm 9 17 OSTO LEIPZIG 34 43 INSTALL THE ROOF PURLINS AND ROOF ELEMENTS 1 ATTACH THEM WITH SCREWS RFR RFB...

Page 10: ...246 4 50 10 17 OSTO LEIPZIG 34 45 PLACE THE FIRST ROOFBOARD FLUSH WITH THE END OF THE PURLINS AND ATTACH WITH 6 SCREWS 3 INTO EACH NEXT RB...

Page 11: ...40 4 40 89 RR2 RR1 FOR THE FASCIA TRIMS INSERT SCREWS AFTER EVERY 0 5 METERS 11 17 OSTO LEIPZIG 34...

Page 12: ...91 EAVES EDGES GO ON TOP OF THE ROOFING NOT INCLUDED 32 4 40 3 mm 12 17 OSTO LEIPZIG 34 RF EE...

Page 13: ...ATTACH ROMBS WITH SCREWS 95 4 4 40 3 mm 13 17 OSTO LEIPZIG 34 ROMB...

Page 14: ...12 M8 70 8 mm 4CM 20CM WINDBOARD 14 17 OSTO LEIPZIG 34 97 DRILL THROUGH THE WALL HOLE MUST BE AT THE BOTTOM OF THE OVAL ATTACH WITH BOLT...

Page 15: ...15 17 OSTO LEIPZIG 34 98 IF DOOR IS TILTED PUSH THE DOOR FRAME SO THAT ALL CORNERS ARE 90 90 90...

Page 16: ...16 17 OSTO LEIPZIG 34 99 IF DOORS ARE IN DIFFERENT HEIGHTS OR THERE IS A GAP BETWEEN THEM ADJUST 3 SCREWS ON DOOR HINGES...

Page 17: ...17 17 OSTO LEIPZIG 34 WHEN THE HOUSE IS ASSEMBLED YOU SHOULD COVER THE TIMBER WITH WOOD PROTECTIVE SEAL PAINT OR STAIN AS SOON AS POSSIBLE TO AVOID DETERIORATION TO THE WOOD 100...

Reviews: