Otolift Stairlifts
Installation manual
71
Remove top and bottom m4 screws at tilt sensor
mounting plate.
7 degree reference.
Top and bottom screws removed.
Control the lift 2 times for 15 seconds. Lift may
not move. Display mainboard will show E98,
Sensor control board will show E60.
Rotate the mountingplate counter clockwise
to -7 degree reference.
Rotate the mountingplate clockwise to 7 degree
reference.
37 - Testing tilt sensor