10
6 Installing the OTT Orpheus Mini
System length up to 100 meters
The installation of the OTT Orpheus Mini is carried out by suspending it in the
observation well. The necessary accessories and type of installation varies
depending on the diameter of the observation well and the design of the top cap:
1" observation wells
see 6.1
2", 4", or 6" observation wells,
see 6.2
OTT top caps
with
recess for adapter plate
Observation wells beginning at 2" in diameter,
see 6.3
Top caps
without
recess for adapter plate
Special case: observation wells beginning at 2" in
diameter without top cap,
see 6.4
System length over 100 meter
For installation of an OTT Orpheus Mini with a system length of more than
100 meters, there is a special cable suspension unit available (see accessories).
This suspension unit is described separately.
Fig. 3: Installation accessories – Part 1.
1 = hole for OTT Orpheus Mini
2 = hole for contact gauge
3 = recess for screws on the top cap
Adapter plate 2"
Adapter plate 4"
Adapter plate 6"
2
3
3
3
3
2/3
3
1
1
2
1
Summary of Contents for Orpheus Mini
Page 1: ...Operating instructions Groundwater Datalogger OTT Orpheus Mini English...
Page 40: ...40 Appendix A Declaration of conformity OTT Orpheus Mini...
Page 41: ......
Page 42: ......
Page 43: ......