Precast Pad Installation 

Outback recommends using precast polymer mounting pads. These pads are designed for proper cabinet 

support and ease of installation. Drilling areas for openings are indicated for coaxial and service sweeps, and 

pre-installed threaded inserts for enclosure attachment.

Site Considerations 

• 

The site must be planned so the enclosure receives good air flow. In areas of extreme heat, position the 

enclosure so that it will be shaded from the afternoon sun. In areas of prevailing winds, it is best that the 

enclosure be located so that the sides of the cabinet face the winds instead of the doors. This will greatly 

reduce the buildup of sand or snow against the enclosure’s air vents.

• 

In areas of potential flooding, the site must be located above the 100-year flood plain.

• 

The enclosure must be placed where it will be free of obstructions, allowing easy access to the doors for 

service or equipment access. For ventilation and maintenance near other solid structures, allow a minimum 

space of 36" (91 cm) between the front and rear of the enclosure, as well as on the sides.

• 

Place the enclosure well away from sources of forced water, such as underground sprinkler systems and direct 

roadway splash.

• 

The concrete pad drawing provided in this manual contains all of the required mounting details, including 

electrical service and cable plant entrances.

• 

For ease of installation, lightweight polymer concrete pads are available from Outback for the OBE-3-FT 

enclosure.

• 

The vapor barrier material (such as 30 lb. felt, neoprene pond liner, or heavy grade tar paper) must initially 

extend at least 6" (15 cm) in all directions around the perimeter of the enclosure and then be trimmed closer 

to the enclosure.

• 

Contact local utilities or cable/piping locator services to ensure that the installation does not interfere with 

existing cables or piping.

Precast Pad

Compacted Gravel

Level Grade

Area of Backfilled Soil

Trench for Sweep

Front of Enclosure

Rear of Pad

Sweep

44" (111.8 cm)

32" (81.3 cm)

27.75" (70.5 cm)

4.625" (11.7 cm)

5.5" (14 cm)

Rear of Pad

Elevation View

42" (106.7 cm)

30" (76.2 cm)

25.875" (65.7 cm)

24" (61 cm)

2.25" (5.7 cm)

3" (7.6 cm)

8.5" (21.6 cm) 10.75" (27.3 cm)

4.5" (11.4 cm)

3.625" (9.2 cm)